Infrastructure

 

INFRASTRUCTURE
STATUS OF INFRASTRUCTURE IN JNV’S
 
I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
 
 
  30 Acres
 
  Yes
 
 
   Yes
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
 
(Completed Masonvy wall with barbed wire wire fencing
                1490 Mts
iii
Permanent buildings constructed
 CBRI pattern
iv
School building
 Complete d
v
Dormitories
 Boys 1.5  Nos.
   with Warden Residence 0.2  Nos.
 
 
 
 Girls 0.75  Nos.
   with Warden Residence 02 Nos.
 
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
  Completed, Area :
348.48X205.11 
   Completed   -  Two dining halls one shift only
vii
Principal Residence
01 No.
viii
Staff Quarters
 
 
 
 
Type III = 24 Nos.
  Type II =  01 Nos.
  Type  I  =  12 Nos.
  SP Sheds converted into Staff Qrs.:  nil.
ix
M.P. Hall
 
Available
 
x
Workshop
 
Available     -  Two
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 
Column based
1.35   litres
 
Working satisfactory
 
xii
U.G. tank
 
Its capacity
 
Present Status
 
 
1.35 Lac litres
 
Working satisfactory
 
xiii
D.G. Set
 
 
 
 
  Available
  Kirloskar make
 10 KV
Working
 
Year of procurement
 
xiv
Sewage Pump
 
not available
xv
Water Pump
 
 
7.5HP capacity
xvi
Electrification
 
Electric connection
 
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
 
  Rural Feeder
   
 Completed
 Nos. of Poles (underground cable)
 
  8-10hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
 
 
 Available
 02 Nos.   – Available
 03 Nos.   – Available
 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
 
 
 Potable, 03 Nos.-  working
 Potable, 06 Nos.-  working:  __-____ hours supply in a day
xix
Rajiv Gandhi Smriti Van
 
  Available
xx
Fire fighting arrangement
 
  Working
xxi
Last date of cleaning of
(a)   Septic tank
(b)   Water tanks
 
30.06.08
30.06.08
xxii
Whether area around transformer is fenced
  Yes 
xxiii
Whether open wells, if any, are covered from top
   All are tube wells only
xxiv
Works taken up under M&R fund during current year and last year:-
 
 
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
2007-08
Plumbing items
  82459.00
 
 
 
Electrical items
  32448.00
 
 
 
Cement bags
19952.00
 
 
 
Misc.items
50428.00
 
 
 
Nursery expenses
2500.00
 
 
 
Daily wages (plumbing , white washing  & maintenance)
168625.00
 
 
 
Soil & sand
9860.00
 
 
 
Paints
81998.00
 
 
 
Motor Repair
1350.00
 
 
 
   TOTAL
 =SUM(ABOVE) 449620.00
449620.00